Validation of new mecano-welded samples for handling equipment
This project required close follow-up and good communication between client and supplier to make sure PPAP samples are conforming to specifications.
Visit of new factory in Malaysia for Self-Adhered Underlayment for Construction
Inspection during first batch to ensure quality complies with ASTM standards
1st batch of steel wear rings for French buckets and handling equipment manufacturer
GO / NOGO test carried out on 10 samples, after mounting in custom-made housings
Quality control of pre-series double cardan joint for cargo bikes
Spline tested with Go/No Go gages to guarantee smooth assembly of shafts at client’s factory.
Quality control of glass wool blankets in Hebei province
Quality control of 30,000sqm of glass wool blankets with white polypropylene film for roofing insulation for a client in ChileControl of the following points: Dimensions of rolls and polypropylene: width, thickness Density Adherence to polypropylene film Average fiber diameter through microscopy Average noise reduction coefficient (NRC) Thermal conductivity
New hydraulic cylinder end cap
Initial samples validation for a new hydraulic cylinder end cap
Inspection of prepainted galvalume steel coils (PPGL) in Jiangsu
The total order amounts to over 1000MT of steel, with 13 different colors. Our inspector is present during the production of the coils, in order to check both the thickness of the galvanization and of the paint.


















